CALDER AND HEBBLE JUNCTION CORRIDOR A629

CALDER AND HEBBLE JUNCTION CORRIDOR A629

Work is now underway to transform the Calder and Hebble junction corridor of the A629 near Halifax - the largest individual civil engineering project ever undertaken to date by Calderdale Council. – where 3,500m3 of LECA LWA has been specified as a lightweight fill for a new highway development. 

The works are set to improve the Calder and Hebble junction and form a significant phase of a wider scope project to improve the A629 between Halifax and Huddersfield. The project aims to improve journey times between Huddersfield and Halifax by up to 30%

This project will include a new link road, which will be created via a bridge spanning the Calder and Hebble Navigation to a roundabout on Stainland Road. The project is fully funded by the West Yorkshire Combined Authority through the West Yorkshire Plus Transport Fund.

FACTS


Amount of material: 3,500m3 of LECA®LWA (10-20mm)

Sub Contractor: SISK

Interesting Fact: The project aims to improve journey times between Huddersfield and Halifax by up to 30%.

 

 

Calder Video Case Study

See the highlights from the initial installation of 3,500m3 of LECA Lightweight Fill.
 
 

New Link Road Development

The ability to reduce settlement of an embankment when incorporating Leca® LWA can offer huge benefits; reducing timescales from years to a few months and even, in some instances, eliminate settlement periods altogether. 

LECA LWA provided a robust water management system for the Rising Main where LECA LWA has the properties to effectively manage rising water levels and prevent flooding.

Using free draining LECA® Lightweight Expanded Clay Aggregate as a structural material within a civil engineering development will intercept the percolating water and water rising by capillary action from the sub-formations and direct the rising water away from the upper construction layers to improve load bearing capacity.

CALDER AND HEBBLE JUNCTION CORRIDOR A629
CALDER AND HEBBLE JUNCTION CORRIDOR A629
CALDER AND HEBBLE JUNCTION CORRIDOR A629
CALDER AND HEBBLE JUNCTION CORRIDOR A629

Construction of embankments over weak and compressible soil deposits, where the loading of the embankment causes soil consolidation and settlement, is common. This major scheme will see the current road layout completely transformed, with improvements to road safety and journey times along the A629.

One of the most significant and complex parts of the project will involve the construction of a new road bridge spanning the Calder and Hebble Navigation to a roundabout on Stainland Road. 

Significant preparation work has been carried out ahead of the works to reduce disruption as much as possible. The benefits of the investment include improved walking, cycling and public transport access, improved air quality and safer journeys, particularly for cyclists and pedestrians.

The project is fully funded by the West Yorkshire Combined Authority through the West Yorkshire Plus Transport Fund.