The New Edition of Leca BUILD is Available Now
The new issue of BUILD Magazine is out, featuring standout geotechnical and infrastructure projects from across Europe.
Inside you’ll find:
Exclusive Interview with Amanda Borneke, Sustainability Expert and Consultant at Sweco, on demolition, reuse, and why compliments work better than hard-hat rules
M25 Junction 28 (UK): Leca LWA used to manage settlement and reduce load on critical structures.
Hålogalandsveien Tunnels (Norway): Frost protection and drainage delivered in demanding tunnel conditions.
B 432 Embankment (Germany): Lightweight fill stabilising a failing road section.
Stormwater Systems (Finland): LWA-based filtration removing over 90% of pollutants.
And much more….
This edition shows how lightweight aggregates are helping engineers and architects solve load, settlement, frost and drainage challenges in smarter, lower-carbon ways.
If you would like support, technical guidance or further project references, our team is ready to help.
Download Build Magazine
preview
Leca® Geotechnical Solutions
M25 Junction 18 Case Study
See Case Study