DERBY RAIL STATION PLATFORM DEVELOPMENT

Sunday 22 July 2018 saw the start of an 11-week partial closure of Derby station, part of the ambitious Midland Main Line Upgrade. Starting south of the station, the project was in operation 24 hours a day and 7 days a week to replace over 2km of track, install 11 sets of points, open a new platform and started on the demolition of platforms in the station.
The purpose of this project was to reduce journey times, improve rail performance, increase the line speed and to segregate services. This remodelling exercise simplified and created compliant track. Furthermore, this provided an opportunity for future electrification development. Achieving those objectives involved a £200 million investment to reconfigure both track and signalling in the Derby station and surrounding area, delivering a more efficient and reliable layout.
LECA® LWA was selected in order to provide a lightweight solution for the rail platform. The lightweight fill was used behind the riser walls in order to reduce loads applied. LECA® LWA was specified in areas where small foundations were installed to accommodate electrical cabinets on the platforms. The cabinets were installed on top of the LECA® LWA
FACTS
Amount of material: 1700m3
Interesting Fact: Lightweight fill was used behind the riser walls in order to reduce loads applied.
Delivery Method: Pneumatic Delivery
Main Contractor: Galliford Try Infrastructure
Overview of Project
Over 1700m3 of LECA® LWA was delivered to site and was installed through the pneumatic blowing facility which was crucial for the development as time was extremely limited and access points to the project site was highly problematic – due to the station remaining partially open during much of the development. The site required delivery at a distance of 70m and the speed of installation was fast and easy.
Further Geotechnical Solutions